Dumpster rental glossary

28 terms, each defined in 40 words or fewer so the definition stands on its own.

All terms

Aggregate
Crushed concrete, brick and asphalt processed for reuse as road base and fill. The largest destination for US C&D debris.
Broker
A company that takes your container order and subcontracts a local hauler to fulfil it, keeping the difference. Owns no trucks.
C&D debris
Construction and demolition debris: concrete, wood, drywall, asphalt shingles, brick, metal and glass from building work. The US generated about 600 million tons in 2018.
Cubic yard
27 cubic feet — a cube three feet on each side. The unit roll-off containers are sold in, and it measures volume only, never weight.
Diversion rate
The share of a project’s waste, by weight, kept out of landfill through recycling or salvage. The number building inspectors ask about.
Driveway protection
Boards or mats laid under a container’s rails and the truck’s wheels to spread the load and prevent cracking or gouging of a driveway.
Dry run fee
A charge for a truck that arrives and cannot deliver or collect — blocked driveway, parked car, overloaded container, locked gate.
Franchise
A locally owned operator licensing a national brand and system. Usually owns trucks, so it behaves like a hauler with national branding.
Front-load bin
The 2 to 8 cubic yard bin with a plastic lid that a truck lifts over its cab. Rented monthly for ongoing service, not by the project.
Gate rate
Another name for a tipping fee — the per-ton price at the scale house where a hauler drops your debris.
Hauler
The company that owns the trucks and drivers, and usually the disposal site. The party that actually performs the service.
Household hazardous waste
Leftover household products that are corrosive, toxic, flammable or reactive — paint, solvents, pesticides, fuel, pool chemicals. Never container material.
Level load
Debris filled no higher than the container rim, so the load can be tarped for transport. A legal requirement, not a preference.
Low-profile container
A roll-off around three to four and a half feet tall, so debris can be thrown over the wall instead of carried through the door.
Occupancy permit
Municipal authorisation to place an object in the public right-of-way for a set period. The permit a street-placed container needs.
Overage charge
The per-ton fee for weight above the tonnage included in your rental. The most common reason a final invoice does not match the quote.
Overhead clearance
The vertical space a roll-off truck needs to raise its hoist and set or retrieve a container — substantially more than the container’s own height.
Right-of-way
The public land a street, sidewalk and verge sit on. Placing a container on it generally needs a permit; your own driveway generally does not.
Roll-off container
An open-top steel container delivered and collected by a truck that rolls it off rails onto the ground. Sized by internal volume in cubic yards, typically 10 to 40.
Roofing square
100 square feet of roof coverage. The unit roofers estimate and order in, and the unit that lets you predict tear-off weight.
Section 608
The Clean Air Act provision requiring refrigerant recovery before an appliance is disposed of. Why fridges, freezers and AC units are refused.
Tipping fee
What a landfill or transfer station charges per ton to accept a load. Set regionally, and the largest single input into what a container costs you.
Tonnage allowance
The weight included in the rental price, in tons. A commercial term set by the hauler, not a property of the container.
Transfer station
A facility where collection trucks tip loads for consolidation into larger vehicles before the trip to a landfill or processor.
Universal waste
A federal category at 40 CFR Part 273 covering batteries, pesticides, mercury-containing equipment, lamps and aerosol cans, handled outside normal trash.
Walk-in door
The hinged rear gate on a roll-off that swings open so debris can be wheeled in rather than lifted over the side.
Waste ban
A state rule barring specific materials from landfill or incinerator disposal. Enforced at the facility, so a banned item can get an entire load rejected.
Waste management plan
A document filed with a building permit stating how construction debris will be sorted, where it will go, and how diversion will be proved.

Sources

  1. Primary source 2024 Analysis of Municipal Solid Waste (MSW) Landfill Tipping Fees — Environmental Research & Education Foundation · last reviewed 2026-08-17
    The full report is a paid publication. The national average and the year-over-year change are reported in the publisher’s own product description and in trade press covering the release.
  2. Primary source Construction and Demolition Debris: Material-Specific Data — US Environmental Protection Agency · last reviewed 2026-08-17
  3. Primary source CALGreen Construction Waste Management Requirements — CalRecycle · last reviewed 2026-08-17
  4. Primary source MassDEP Waste Disposal Bans — Massachusetts Department of Environmental Protection · last reviewed 2026-08-17
    mass.gov refuses automated requests from this build environment (HTTP 403). The ban list was read from the publisher’s own guide through a search index and cross-checked against the October 2021 amendment document below.
  5. Primary source Universal Waste — 40 CFR Part 273 — US Environmental Protection Agency · last reviewed 2026-08-17
  6. Primary source Household Hazardous Waste (HHW) — US Environmental Protection Agency · last reviewed 2026-08-17
  7. Primary source Appliance Disposal — Section 608 refrigerant management — US Environmental Protection Agency · last reviewed 2026-08-17